Clinton, TN

Design for power and lighting upgrades to the Tennessee Valley Authority (TVA) Pre-Ground Limestone facility that housed a 2,354 square foot blower building and two silos; Design scope included area lighting for 24-hour operation and convenience power for welders and other maintenance equipment.