![]()
Art Institute of Jacksonville The second phase of the project was a 1,550 square foot Tenant Fit-Up for a Dining Lab. The project consisted of an Instructional Dining Lab, Chef’s Office, and some common areas. The third phase of the project was a 1,960 square foot Tenant Fit-Up for a Video Studio. The project consisted of an Instructional Video Studio, a Video Control Room, Technical Room, and storage. The spaces were mechanically heated and cooled by a powered induction terminal unit with primary air provided by a variable volume direct expansion rooftop unit. |